Public Notices - 28 August 2026
Roadworks on Howitt Street, Wendouree
Roadworks are required as part of Development Victoria’s Ballarat Major Events Precinct project and are to occur on Howitt Street, between the Creswick Road intersection and White Avenue.
East and westbound carriageways along Howitt Street will be limited to one lane during the works with speed restrictions to 40 km/h in place throughout the construction period. Traffic control will be present when required. Works commenced on 24 August and will be completed by 25 September 2026, weather permitting.
The Raffaello Carboni Lecture
Eureka Centre and Ballarat Italian Association Inc. have joined together to present the inaugural Raffaello Carboni Lecture to support the International Day of Democracy.
Professor Frank Bongiorno AM will deliver the first lecture on the topic, ‘Why multiculturalism is good for democracy’ at the Eureka Centre on Tuesday, 15 September 2026 at 6pm.
Visit eventbrite: Raffaello Carboni Lecture with Professor Frank Bongiorno AM for ticket information.
MR Power Park carpark upgrade to commence
Works to upgrade the MR Power Park carpark are set to commence, with temporary fencing to be installed from Friday, 14 August. All major elements within the reserve such as the play space, skate park, and dog off lead area will remain open for the duration of the works. The toilets and seniors’ gym will remain open for much of the time but may be required to close for a brief period while connecting paths are constructed and planting works are undertaken.
During construction, access to the toilets, skate park and play space will be to the north of the Phoenix Centre (red arrow), and access to the off-lead dog area will be via the gate on Grant Street (blue arrow). Visitors to the facilities will need to utilise on-street parking during this period.

Pet of the week: Maggie
About Maggie
Meet Maggie, a delightful dog who perfectly balances her love for affection with an independent spirit. She adores human company and will happily soak up all the love you have to offer.
Maggie will require a securely fenced yard to keep her safe while she explores her space. Maggie would be suitable in a multi-dog household. Maggie must go to a household without cats.
Maggie is a playful girl who delights in playing with her toys, she will benefit from daily exercise and mental enrichment. Her intelligence is one of her standout traits, as she quickly picks up on basic commands and has already mastered toilet training.
Maggie is good when walking on lead, but she can get a bit over-stimulated when encountering other dogs on a walk, so a strong and capable owner who can manage her size with confidence and patience will be best.
If you're looking for a smart, loving, and playful dog, Maggie might just be the perfect match for you!
To meet your new pet contact the Ballarat Animal Shelter on 5334 2075 or email animalshelter@ballarat.vic.gov.au, see all pets for adoption on Pet Rescue
Open Consultations on MySay Ballarat
| Consultation | Closing date |
| Wendouree Local Shopping Strips, Placemaking Initiative engagement | 30 August 2026 |
| City Oval Precinct Masterplan | 30 August 2026 |
| Naming of the Redeveloped Eastwood Facility | 6 September 2026 |
| Buninyong Botanic Gardens Baths | 18 September 2026 |
| Four Bin Kerbside Service Review | October 2026 |
| Burrumbeet Creek Flood Investigation | Ongoing |
Open Tenders
| Tender No | Tender Description | Closing Date |
| VP519758 | Ballarat Aquatic & Lifestyle Centre Heat Pump Electrification (EOI) | 25 August 2026 |
| VP519625 | 26/27-2 Pedestrian priority Crossings - Vickers Street Sebastopol, Canadian Creek Trail Ballarat, Dana Street and Grenville Street Ballarat Central | 26 August 2026 |
| VP520507 | Ballarat Airport Terminal and Apron Works - Construction | 1 September 2026 |
| VP520473 | 25 26 496 Ballarat Regional Landfill Operational Services (EOI) | 1 September 2026 |
| VP520469 | 26/27-16 Callow Street, Ballarat East Shared Pathway | 1 September 2026 |
| VP520720 | 26 27 11 Ring Road and Trewin Street, Mitchell Park / Wendouree Roundabout Construction | 2 September 2026 |
| VP520752 | 25 26 441 Facilities Panel - 3 Builder Services | 3 September 2026 |
| VP520411 | 26/27-12 DCP-BW-Greenhalghs Road Upgrades Winter Valley | 8 September 2026 |
More news
Fringe Encore set to debut in Ballarat this October
Active transport boost as new path linkages along the Glenelg Highway break ground
September Planning Delegated Committee Meeting
Public Notices - 11 September 2026
Mayor's Message - 11 September 2026